Leaking Shower Repairs
April Showers    Waterproofing   Catalogue   Contact Info

                  Step 9 - Re-tiling the shower area 

        Before re-installing the shower screen, let the adhesives,
        grouts and mortar to cure for 4 days.

  • Use a good quality wall tile adhesive to re-tile the wall edges.

  • Recommended for the hob tiles is a cementitious based tile adhesive.

  • A flexible pre-mixed and water resistant tile grout is used.

  • All floor tiles are wet bedded on a mortar bed which consists of a 4:1 Sand and
    Cement mix.

  • The grout used on the floor tiles is mixed with off white cement and sand.

  • Use a grout rake to remove grout from the vertical internal corner of the shower area.

  • Use a caulking gun to apply a bead of flexible anti-mould silicone down this internal corner.